Gizmodo

Ahead of NASA’s long-awaited return to crewed Moon landings, the space agency is testing an elevator that will carry astronauts from their spacecraft to the lunar surface. If all goes as planned, this elevator will be ready for the Artemis 3 and 4 missions, ambitiously set for 2025 and 2028.

Gizmodo

It’s time to look back at spaceflight in 2023, a real “two steps forward, one step back” kind of year, filled with highs, lows, and everything in between.

Read more...

Gizmodo

Experimental rockets, Moon landers, planetary flybys, breathtaking spacewalks, and vintage boosters—these are just a few of the many stories that contributed to the most striking and memorable images of 2023.

Read more...

Gizmodo : Environment

Four astronauts are getting ready to travel to the Moon and back for NASA’s Artemis 2 mission, and the space agency is making sure that the crew is well-prepared in case things go wrong during the 10-day journey through space.

Gizmodo

Fresh footprints on the Moon aren’t likely to happen in 2025 as NASA hoped. A new report warns of significant delays to the Artemis 3 mission, the result of two key contractors—SpaceX and Axiom Space—not being able to deliver the goods on time.

Read more...

Gizmodo : Environment

Nearly a year after an uncrewed Orion splashed down in the Pacific Ocean, NASA anticipates it still needs a few more months to resolve a lingering issue with the capsule’s heat shield before a crew can ride on board.

Gizmodo

Frank Borman, born in 1928, emerged as one of the most influential figures in the history of space exploration. As a test pilot, astronaut, and commander of the groundbreaking Apollo 8 mission, Borman’s career spanned the heights of the Cold War space race.

Read more...

Gizmodo

In recent updates on NASA’s Artemis program, all four core stage engines have been installed onto the booster of the second Space Launch System (SLS) rocket, but a production issue has temporarily slowed work on the third.

Read more...

Gizmodo

NASA’s goal to reduce costs on its Space Launch System (SLS) rocket by switching to a commercial service contract was dismissed in the latest audit of the space agency’s ongoing Moon program.

Read more...

Gizmodo

In preparation of landing humans on the Moon as part of the ongoing Artemis program, SpaceX recently ran a test of one of its lunar lander engines while simulating the cold temperatures of space.